1. In order to automatically zeroise solder paste/process material during
Volume Checking process, user is required to set a rule hierarchy called, "
IsAutomaticallyZeroiseProcessMaterial".
Image 1
2. When the rule hierarchy is set, the process material will be zerolised automatically when user assign another process material on Work Order Process Material Control-Volume menu.
Image 2
Image 3
Image 4
Action Required: User