This is the step to register the process material that is going to be used for the production. User will need to register, which means generate new lot info for process material. Then only user can begin the thawing and spinning process. The process material will be used at SMT line conversion stage
1.Registration process material
1. To register process material that will be stored into freezer.
2. In menu, go to Production -> Process Material -> Registration
3. Click Add
4. Select Container Type, Freezer Name, Name, Status.
5. Scan process material lot number barcode, click Save.
Example of process material lot number:
Once process material successfully registered, system will display below message on the top right corner:
Error messages:
- If no information entered below message will appear:
- Wrong lot number being scan. Please confirm the correct barcode for lot number to scan.
-The lot number does not match the process material name
II. Thawing and Spinning
Once process material taken out from freezer for thawing and spinning, operator needs to scan out in system.
1.In menu, go to Production -> Process Material -> Thawing and Spinning.
2.Scan in the process material 2D barcode. Click Search.
3. Click Scan Out.
Once scan out is successful a message will display on the top right corner:
After done thawing and spinning, operator will need to scan in the system again.
4. In menu, go to Production -> Process Material -> Thawing and Spinning.
5. Scan in the process material 2D barcode. Click Search.
6. Click Done Normalization.
Once Done Normalization button, a successful message will be displayed on the right top corner.
7.Back to the same page and scan in the process material 2D barcode.
8.Click Done Spinning
A successful message will be shown after you click done spinning button
When you
search back the process material in the page , it will show the status as
Finish Spinning and the Scan Out button and Done Spinning buttons will not be
clickable
You can check the process material history in Inquiry > Process Material History
If process material does not have enough preparation time, an error message will be shown:
Please allow for enough processing time to proceed.
Once successfully done spinning a message will display on the top right corner:
1. Start line conversion by clicking Scan Work Order button
Production -> SMT Line Conversion
2. Scan in Process material barcode.
System will then ask the operator if this is a model conversion. Click Confirm.
After confirming a message will show on the top right corner:
A stop production for line conversion will be issued after successfully starting line conversion.
You can view the stop production record at Production control > Line Control > Resume Production
You can view the assign process material record in Inquiry > Work Order Profiler History
3.Click Checklist button to answer checklist
4. Click on the question set to answer.
If the checklist is all answered correct, the checklist question button will be showing green color and a success message is displayed.
Checklist button will be grey after you answer all the checklist questions
5.Do Volume check by clicking the volume Check button
6. If process material is enough, select yes and click submit.
If process material is not enough and require to top up, select no and scan in process material serial number, then click Submit.
7. Do process material SPC check by clicking SPC check button
8. Key in the reading values and click submit.
After submitted system will show the screen for process material height chart. From here operator can click Search to display SPC chart.
9. Do SPC Reflow Check
10.Key in the reading values and click submit.
11.After submitted system will show the screen for process material height chart. From here operator can click Search to display SPC chart.
12. Re-Buy Off Board (Optional, when you fail QA buyoff)
Click on Re-Buy Off board button will allow creation of another new panel to be able to proceed in production to QA buy off. Maximum panel allowed is 5 panels.
Enter OCAP and click Submit button. This action cannot be edit, so be careful before submitting the result.
13. QA buyoff
Production -> Production Control -> QA Buy Off
Fill in the line, work order, operation and click submit
Click the Data Collection Check List link to answer QA checklist questions
Notice that QA buyoff will have a (QA) added behind the title to show this is a QA buyoff data collection
Once you finish answering the checklist correctly it will show a success message and question button will become green and it will show red if you have any incorrect answers.
14.Once you answer all questions correctly, click Pass to complete the buyoff
15.Click OK to confirm the buyoff
After QA buy off successful a message will show at the top right corner:
After pass QA buy off, the stop production will be removed.
You can view your buyoff record in Report > Line Conversion History
16. If you want to fail buyoff, you will need to click the Fail button
User will need to type in the CAR and click confirm to fail the buyoff
17. Press confirm to fail the buyoff
After you fail the QA buyoff, user will be able to start another QA buyoff and redo the QA buyoff questions.
Finish the question and now pass the QA buyoff.
In Inquiry
> Data Collection & Genealogy Inquiry, user can view past answered
QA checklist answers
In Production control > QA Buyoff History, user can view their QA buyoff results
18. If you want to use manual scan sn during QA buy off
Just scan the serial number on the board and click Add button. The record will be saved into the grid. Once number of record equal to number of quantity cavity in the board, QA section will show the Pass Fail button. Continue as the flow mentioned above.