mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Auto Issue Unplanned Downtime for Moulding Operation

Creation date: 2/27/2025 2:36 AM    Updated: 2/27/2025 2:36 AM   dashboard oee unplanned downtime
Print...
1. System will issue an unplanned downtime with the unplanned downtime type as Equipment / Jigs & Fixture down when the system detects that the user has not completed a transaction using the API for more than 30 minutes.
Image 1

2. System will remove the unplanned downtime automatically when system detects that user has completed the transaction using API.

Action Required: User
DataImage12.png

On this page

    Get help for this page Powered by Jitbit HelpDesk