1. To review/approve/reject the SPC Control Limit, user can go to Production > Production Control > Approval List.

Image 1

2. User can click the first icon to review the newly calculated spc control limit before approve or reject it.

Image 2

3. After user has reviewed the control limit and has decided to approve the control limit, user can click the first icon on the left bottom to redirect to approve the spc control limit.

Image 3

4. User can then click the Approve button to approve the spc control limit and send it to level 2 and above for approval.

Image 4

5. User can also click the Re-Calculate button to reject the SPC Control Limit and system will required user to re-enter 30 points.

Image 5


Action Required: User