To scan unit to RMA/ Rework Work Order with file

Creation date: 6/1/2023 11:42 PM    Updated: 7/29/2024 4:53 AM   rework rma serial number unit work order
1. User can scan the unit to RMA/Rework Order by using an excel file.

Image 1

2. User can click the Choose File button to select the Excel file from folder.

Image 2

3. The excel file should include the serial number and the work order number of respective of respective units like Image 3.

Image 3

Note* The work order inside the excel file should be the work order of each unit NOT the RMA/Rework work order.

4. After user has selected the Excel file, user can then click the Import button to transfer the unit from Production Work Order to Rework/ RMA work order.

Image 4

5. If the file content or the serial numbers are INCORRECT, the system will display an error message.

Image 5

6. If the file content and serial numbers are CORRECT, the system will display a success message.

Image 6

7. User can go to Unit Status page and also the Unit History page to check if the unit has been transferred to the rework order.
 
Image 7

Image 8

Action Required: User