mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Repack packaging box with "Shipped" status

Creation date: 12/19/2022 1:37 AM    Updated: 12/19/2022 1:37 AM   cancel packaging packaging box packing repack shipment shipped status submit unpack
Print...
When user is trying to repack the packaging box with "Shipped" status, user will have to cancel the shipment first.

1. User can go to Production > Production Control > Cancel Shipment.

Image 1

2. User can select the customer and enter the box id on this page.

Image 2

3. After user has successfully cancelled the shipment, then only user is able to repack the packaging box.

Action Required: User
DataImage36.png
DataImage53.png

On this page

    Get help for this page Powered by Jitbit HelpDesk