The work order is having Stop Production when the MSL balance life is below requirement.
Image 1
User can go to Production Control > Line Control > Resume Production to see the details of the MSL under Note column.
Image 2
The second way to check the Balance Life details is through the MSL Packing Closing page.
Image 3
Action Required: User