mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

No Component Traceability Record Found

Creation date: 10/26/2021 4:29 AM    Updated: 10/6/2022 3:04 AM   component traceability plv product
Print...
User may need to check whether the Part Line Verification(PLV) flag/checkbox in the product page was checked.

After that when doing the PLV then will start to have the Job to do the component traceability work. If not when you search  at the component traceability report it will not able to show out the record. 

*When create new product, by default, the Part Line Verification will be auto checked.*
Component Tracebility Report no record.PNG

On this page

    Get help for this page Powered by Jitbit HelpDesk