mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Sampling After Packaging

Creation date: 4/29/2024 1:12 AM    Updated: 4/29/2024 1:12 AM   packaging plan sampling
Print...
1. In order to do sampling after packaging operation, user is required to include the route step for sampling and also maintain at product management page.

2. On Product Management page, user is required to tick the Sampling Before Shipping option.

Image 1

3. On Route Maintenance page, user is required to include the sampling operation.

Image 2

Action Required: User
DataImage27.png
DataImage97.png

On this page

    Get help for this page Powered by Jitbit HelpDesk