mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Route Setup For SMT

Creation date: 5/24/2023 5:49 AM    Updated: 5/24/2023 5:49 AM   ate route route step serialized with work order spi
Print...
Route setup Data Collection Type for SPI route step. For SPI route step cannot set Data Collection Type as "Manual," you need to set as "Line Configurable"

Route step Data Collection Type "Manual" WRONG SETUP


Route step Data Collection Type "Line Configurable" CORRECT SETUP


Scenario that will happen when setup the wrong Data Collection Type for SPI route step:
  • Serialized with Work Order unit didn't create at the First MES route step during ATE transaction.

DataImage91.png
DataImage89.png

On this page

    Get help for this page Powered by Jitbit HelpDesk