mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Sampling Plan - Unit Batch

Creation date: 11/29/2022 4:24 AM    Updated: 11/29/2022 4:24 AM   batch group id number packaging box route sampling sampling type serial number setup
Print...
User is required to be aware of the value input for sampling.

Image 1

Image 2
The batch number/serial number field will be changed according to the selected sampling type. Therefore, in this case, user should input the batch number/serial number instead of packaging box number.


Image 3
For sampling by batch, user should not check the Group Units into Batches in Route setup.

Action Required: User
DataImage33.jpg
DataImage56.jpg
DataImage48.jpg

On this page

    Get help for this page Powered by Jitbit HelpDesk