mtrac Helpdesk
sign in
Knowledge base Ideas forum

  • General Issues
  • ERP Interface
  • Technical
  • Unit Batch
  • Inquiry
  • Production Control
  • API
  • Report
  • Data Collection Set
  • Maintenanace
  • SQL
  • Serial Number Mask
  • Route
  • Sampling Plan
  • Moulding
  • MSL Control
  • mTrac Settings
  • Packaging
  • Work Order
  • Product Tree
  • Product
  • PTI (WI)
  • Process Material
  • Part Line Verification (PLV)
  • Shipment Module
  • Feeder Loading List(FLL)
  • Rule Hierarchy
  • Defect
  • Material Kitting
  • SPC Control
  • Database
  • Rework/RMA
  • Mobile
  • Non-Conformance
  • Page Load
  • Shipment Record
  • MACS
  • Downtime Tracker
  • Component Traceability
  • ATE
  • Dashboard
  • Feature requests
  • Identity Change
  • Label
  • Laser Mark
  • Material Lot
  • OTE
  • PTI
  • Unit
  • Unit History
  • Work Order Line Conversion
  • EUK
  • Rework/Debug
  • Work Order
  • Route Card
  • Labour Hour
  • Inquiry
  • Unit
  • Queries & Tables
  • ETL Queries & Tables

Send to rework

Creation date: 11/2/2022 9:21 PM    Updated: 11/2/2022 9:22 PM   packaged unit packaging box packaging box unit rework send to rework unit unit location unit readiness unit status unpack
Print...
When user wants to send the units to rework, user can directly send the units to rework and is not required to unpack the units from packaging box as the function will unpack the units itself.

Image 1

*Note: User must ensure that there is unit readiness set up based on the unit's status, location and unit readiness task. If not, the units will not be able to send to rework.

Action Required: User
DataImage4.jpg

On this page

    Get help for this page Powered by Jitbit HelpDesk